Also Read
Experiment No: Date:
<Following Joint Name>
Aim :
To prepare a Following Joint as per dimensions given in sketch.
Material Required:
Teak wood 300mm X 45mm X 35mm
Tools Required:
1. Steel rule 300mm2. Handsaw 300mm
3. Wooden jack plane 450mm
4. Try square 200mm
5. Marking gauge 200mm
6. C-Clamp 200mm
7. Firmer chisel 150mm
8. Adze 150mm
Sequence of Operations:
1. Marking 2. Planning 3. Cutting 4. SettingProcedure:
- Select a teak wood material and mark the size as per drawing with the help of marking tools like steel rule, marking gauge, try square.
- Planning of sides with the help of wooden jackplane to maintain the required dimensions.
- Fix the work piece in carpentry vice and cut into two equal pieces of size 150mm X 30mm with the help of handsaw.
- Mark the two work pieces for male cutting and groove cutting as per dimensions.
- Fix the work pieces one by one on the bench with the help of ‘C’ Clamp and a groove is made as shown in drawing with the help of chisels and adze.
- The two work pieces are fitted to make Lap Tee Joint as per drawing.
Precautions :
- We should be careful while marking and planning
- Special care is required while cutting the groove with firmer chisel so that the dimension is not exceeded.
Result:
Lap Tee Joint is prepared as per given dimensions
Comments
steel contractor london/
http://www.supersteel.co.uk/steel-reinforcement-london/steel reinforcement london/
steel stockholding london/
<a href="http://www.supersteel.co.uk/steel-erection-london/steel erection london<a>/