Four tap water distribution system

Also Read

Ex.no:                                            Date:                        

Plumping of Four tap water distribution system 

Aim:
To construct the one tape water distribution system by using plumbing components.

Fittings required

1. PVC pipes
2. Tank fitting(GI)
3. Union(GI)
4. MTA(PVC)
5. Gate valve
6. Elbow
7. Reducer(GI)
8. Bend(PVC)
9. FTA(PVC)
10. TAP(PVC)

Procedure

1. The given PVC pipes are measured out to the required size.
2. The suitable die is selected.
3. Gate valve is connected between the two MTA.
4. 1” x ¾” reducer connected between 1” pipe and ¾” pipe.
5. 1” (GI) bend is connected between the two pipes.
6. ¾”x1/2” reducer connected between ¾” pipe and ½”.
7. ½” bend connected between ¾” and ½” pipe.
8. Finally FTA ½” connected at four ends and then ½” tap fixed to the four ends.

Result

Thus the plumbing of Four tap water distribution system was constructed.